|
|
|
Size
|
LCWS 2005 is Coming!
|
Jim Brau |
Thu, 16 Dec 2004 17:22:23 -0800 (PST) |
63 lines |
Silicon Detector Design Study Newsletter
|
Jaros, John A. |
Thu, 16 Dec 2004 15:43:58 -0800 |
297 lines |
UCLC/LCRD Accelerator Proposals
|
Graf, Norman |
Thu, 16 Dec 2004 11:06:47 -0800 |
103 lines |
LBNL Contract up for renewal.
|
Graf, Norman |
Thu, 16 Dec 2004 08:48:41 -0800 |
62 lines |
Silicon Detector Design Study Newsletter
|
Jaros, John A. |
Mon, 13 Dec 2004 17:24:43 -0800 |
296 lines |
BESAC presentations available
|
Graf, Norman |
Mon, 13 Dec 2004 09:24:15 -0800 |
76 lines |
Energy Secretary nominated
|
Graf, Norman |
Mon, 13 Dec 2004 09:14:20 -0800 |
60 lines |
Large Gaseous Tracking LC Detector Meeting
|
Jim Brau |
Fri, 10 Dec 2004 13:58:40 -0800 (PST) |
55 lines |
Dec. 9-10 LC simulation workshop talks available
|
Graf, Norman |
Fri, 10 Dec 2004 10:32:32 -0800 |
56 lines |
LCRD, UCLC, DOE, NSF funding update (fwd)
|
Jim Brau |
Fri, 10 Dec 2004 09:32:05 -0800 (PST) |
243 lines |
CALICE meeting presentations
|
Graf, Norman |
Fri, 10 Dec 2004 08:54:08 -0800 |
54 lines |
LC imulation mini workshop
|
Graf, Norman |
Tue, 7 Dec 2004 08:55:31 -0800 |
75 lines |
ITER
|
Graf, Norman |
Tue, 7 Dec 2004 08:38:59 -0800 |
67 lines |
Funding science infrastructure
|
Graf, Norman |
Wed, 1 Dec 2004 13:40:25 -0800 |
79 lines |
Visa requirements for travel to USA
|
Jim Brau |
Wed, 1 Dec 2004 12:41:12 -0800 (PST) |
51 lines |