Hi,
unfortunately, I could not call more than two persons. Concezio was
not reachable.
I'll summarize what Wolfgang, Antonio and myself has been discussing:
1) Status of the code
* VVF is in place except the pstar factor.
=> Wolfgang is concentrating on the pstar factor now
=> Chukwudi should start the mm2-scans for the different
selections immediately
* Wolfgang will check the timing binned vs unbinned
2) Antonio's mES fit on full MC with all selection cuts looks good:
Fitted signal yield: 22205 +- 566
Expected signal yield: 21328
=> 1.55 sigma
3) BAD
We will remove all CM1-CM2 comparisons
Heiko: * Revision of Executive Summary & Introduction, 2.1
* Merge all Vub extractions in one chapter
using BLL, BLNP and DGE
Antonio: * 2.3: mES fit
* 2.5: where text refers to mES fit
* Fig. 4 and a corresponding Fig. with all cuts
* Fig. 6-12 with Run-wise data MC-comparison
Plots in Appendix A
Wolfgang: * Join after pstar factor is fixed
* mX, Pplus, mX-q2 fits and results
* Important: 2- and 3-parameter fits
Chukwudi: * Put the scan resuls for the different selections
in an Appendix, e.g. B, once ready.
We will provide the first version of the BAD by this Friday.
Wolfgang and Antonio: If I have forgotten something don't hesitate
to add it to this thread.
We'll meet tomorrow, Tuesday, 8:15 SLAC time, as usual.
Cheers,
Heiko
|