ATLAS SCCS Planning 28June2006
------------------------------
Present: Wei, Shirley, Booker, Randy, Stephen, Charlie, Steffen
Agenda:
1. DQ2 Status/Web Proxy
Now moved to atl-dq2. Web server request has been updated and they
should be scanning it sometime soon.
2. mysql replica Status
Up and running on atl-prod02. This will be dropped from next weeks
agenda.
3. Trigger Farm Status
Some discussion about what switch to buy has been going on but no
further information at the moment.
The replacement machines have been ordered, but bits might come in
in pieces. Within three weeks it should be arriving. End of BaBar
run is delayed till the 21st August, so need to keep the existing
system in place for around a week after that. So the machines will
not move till at least early September. Would like to move it as
soon as possible after that.
Have asked Charley to get a price for the switch that will be
required.
Small questions like who provides the ethernet cables still open.
Once the machines are moved upto SCCS for the ATLAS trigger farm
they will no longer require maintenance. If they die, they die.
4. ATLAS Oracle Server
Believe this was waiting for Chuck to allocate hardware.
5. Meeting Time
Move to 9am next week. Randy will arrange a room for 90
minutes. Stephen will arrange a phone conference.
6. AOB
Have asked the US ATLAS to run production jobs again now that we
have the new DQ2.
Will try to send Wei and Andy to the SRM/dCache workshop at
Fermilab on the 17t July. Wei is heavily involved in the Grid side
of things so it would be useful. Andy should go to understand how
xrootd can fit in with the role dCache is filling just now. Need to
understand if there is any travel budget left.
Action Items:
-------------
060628 Stephen Arrange phone conference for future 9am meetings
060628 Randy Arrange meeting room.
060412 Systems Provide Oracle service for ATLAS Trigger testing (RT
46089)
060419 No ticket yet, so nothing done.
060426 Now have ticket 46089.
060503 No news.
060524 Steffen has provided configuration information. Now in
Chuck's
hands.
060628 Randy will ask Chuck about status.
060224 Stephen Enquire with ATLAS about certificates for DQ2 machine
060301 Not heard back from ATLAS folk, Wei pointed out a DoE
place to get service certificates.
060308 No update.
060315 No update.
060405 No update.
060412 No update.
060419 No update.
060426 No update.
060503 Latest revelation about grid proxy issues illustrates
this should be solved.
060628 Done. New DQ2 instructions provide information for getting
a DoE Web Server certificate.
060224 Chuck Will check on web server request for DQ2 machine
060301 Waiting for web server request information from Stephen.
060308 Haven't checked yet; haven't received Stephen's request yet.
060315 Still not sent Chuck information.
060405 No update.
060412 No update.
060419 No update.
060426 Resubmitted request as it was lost before.
060503 Not heard anything for about two weeks.
060524 Stephen need to update ticket, moving from yakut to DQ2
machine.
060628 Request updated now running on atl-dq2, waiting for scan.
060224 Richard Discuss ATLAS trigger machines with others in SCCS
060301 Only limited response from John W was resigned
acceptance... need to work on an actual deployment plan as
there are real issues to be solved.
060308 John aware and in plans as much as anything is. New
engineer will take over.
060315 No update.
060405 No update.
060412 No update.
060419 No update.
060426 No update.
060503 No update.
060524 RT 45823. Engineer looking at power availability. On track
for
August.
060628 Understand schedule, Randy will make sure John is aware.
|