Hi Heiko,
Just to be sure: are we still discussing Run 1-4? I think we are.
Masahiro
On Jul 26, 2006, at 8:15 PM, Heiko Lacker wrote:
> Hi,
>
> here is our publication time schedule:
>
> End of July: Documentation of new strategy of mES fit into BAD
> (Antonio & Concezio)
> Also D** issue?
> August: Parallel work:
> * Working on backup solution (Wolfgang)
> --> higher purity cut: Old model
> * New strategy with higher purity cut (Chukwudi)
> CM (Sept.): Presentation of mES fit strategy
> Supporting document with fixed mES strategy --> AWG
> End of Sep: Analysis to RC (fit strategy approved?)
> Beg. of Oct: If yes: Evaluation of systematics
> Mid of Oct: Paper draft to RC and then to CWR
>
> Our attempt to find a new well-controlled mES fit strategy
> despite a lot of work has not converged to a stable version
> yet. We suspect that we are suffering from the low purity.
> As a consequence, we will try to understand if we can find
> a stable solution with tighter cuts on purity. In parallel,
> Wolfgang will look into the same direction but try to under-
> stand if we could simply use in this case our old strategy
> as a fall-back solution.
>
> A status report does not seem possbile before the September
> CM due to the August holiday period.
>
> Cheers,
> Heiko
--
Masahiro Morii <[log in to unmask]>
Harvard University, Department of Physics
17 Oxford Street, Cambridge, MA 02421, USA
|