Attendee: Len, John Bartelt, Book, Wei, Stephen
1) DQ2 and Production
Production is OK. Some other jobs run longer than xlong queue. But xxl
queue has a limit of 64 jobs.
2) Hardware
The CPU nodes have arrived and will be installed soon. Not sure about
the storage. Storage needs to be ordered soon to handle the coming AOD
and Full Dress Rehearsal.
3) AOB
a. Hard driver for atl-prod02 (atlas release mirror). Len had agreed to
give a 72GB hard drive to atl-prod02 in exchange for a 32GB hard drive
currently on atl-prod02. This will solve the immediate problem.
This is done (the 72GB drive is available on atl-prod02 as /u1).
b. SRM frontend (bestman-xrootd) is deployed and used in ATLAS network
throughput test.
c. 10Gb WAN upgrade. ATLAS facility requires 400Mbyte/s between BNL and
SLAC (doesn't mean it will use these much all the time). Wei is working
with various SCCS groups to identify UPS power for the 10Gb switches.
Many machines will need to be moved to new switches. They also need new
IPs.
--
Wei Yang | [log in to unmask] | 650-926-3338(O)
|