LISTSERV mailing list manager LISTSERV 16.5

Help for LQS-L Archives


LQS-L Archives

LQS-L Archives


LQS-L@LISTSERV.SLAC.STANFORD.EDU


View:

Message:

[

First

|

Previous

|

Next

|

Last

]

By Topic:

[

First

|

Previous

|

Next

|

Last

]

By Author:

[

First

|

Previous

|

Next

|

Last

]

Font:

Proportional Font

LISTSERV Archives

LISTSERV Archives

LQS-L Home

LQS-L Home

LQS-L  June 2009

LQS-L June 2009

Subject:

Re: LQS meeting, **2 PM Eastern**, Thursday, June 25, 2009

From:

Frank Taylor <[log in to unmask]>

Date:

24 Jun 2009 03:54:14 -0400 (EDT)Wed, 24 Jun 2009 03:54:14 -0400 (EDT)

Content-Type:

TEXT/PLAIN

Parts/Attachments:

Parts/Attachments

TEXT/PLAIN (125 lines)

Dear All,

The paper is interesting - unfortunately I accepted a social engagement at 
8:00 PM Geneva time (2:00 PM EDT) so I will not be able to call in. 
My apologies. 

1. LHC 

The latest from the LHC - from CERN LHC web site but no real news about 
the schedule. ATLAS has decided to start 24 hr shifts in September rather 
than August. There will be a seminar 02-Jul-09 by Myers which should be 
interesting (and jam-packed). ATLAS has recommissioned the magnets and all 
is fine. We're running cosmics in 'combined' mode (nearly all subsystems 
operating - except TGC endcap trigger chambers don't have operating gas 
and CSCs where the ROD firmware is being upgraded).

>From Web:
-------------------------------------------------------------------------
Sector 4-5 is being warmed to room temperature. The sector was previously 
warmed to 80 Kelvin in order to perform a test on the copper component of 
the busbars at non-superconducting temperatures (See previous update). 

One of the LHCs electrical interconnections being repaired.

During the test at 80 Kelvin one busbar with potentially high resistance 
was found. The sector is now being warmed to room temperature in order to 
perform a more accurate test on all the copper busbars. By comparing the 
results of the two tests (80 and 300 Kelvin), the accuracy of the 
80-Kelvin test can be verified to help interpret data taken from the other 
cold sectors. 

In Sector 1-2 the repairs have been completed to all the electrical 
interconnections and the last W bellow has been closed. After final 
electrical checks and insulation vacuum checks the sector will be ready to 
start the cool down process. 

The beam lines in Sector 6-7 have been closed. The sector has been tested 
with the RF ball, which showed no problems with the interconnections. 
(More details on RF ball testing available here). Repair work on the 
electrical interconnections is still ongoing. 

The LHCs anti-clockwise beam transfer system was tested on 6 and 7 June. 
Particle bunches were sent from the SPS through the transfer line toward 
the LHC where it intersects just before the LHCb cavern. 

The beam was sent down the 2.8km transfer line and stopped just before
reaching the LHC tunnel with a beam stopper (known as a TED) - 4m of
graphite that is physically placed in the path of the beam line to prevent
the beam from taking the last step into the LHC.

A seminar on the status of the LHC will be given by Steve Myers on 2 July. 

---------------------------------------------------------------------------

2. Micromegas:

We're writing an R&D proposal for upgrades of muon system which has a
draft budget for micromegas at ~ $500k. Vinnie is planning to come to
Harvard next Tuesday 30-Jun-09 to talk to Huth, Oliver, et al. about
micromegas (mostly electronics). Vinnie agreed to come to MIT on Wednesday
morning 01-Jul-09 to discuss the R&D prospects with you if you would like
him to. At the moment the plan is very rough and various groups are
offering to get involved by focusing on specific things. For us, perhaps
it's the behavior in B-field, large scale construction and
pattern-recognition.

The electronics readout is a big issue with the large channel count. At 
the moment Vinnie is assembling a group from BNL, Arizona and perhaps 
Harvard to work on this. We could be involved in testing but I don't see 
us doing much on the front end ASIC design. For DMTPC you need to extract 
direction information from the readout.   

One of the longer term R&D projects being pushed by Michigan is to use
plasma screen technology to make the amplification gap in a micromega-like
chamber. The claim is a more simple readout and cheap anode fabrication 
but the development is quite primitive at the moment. 

Sorry for the long email - apologies for not being able to call in. 
 
Any news about a DoE visit?

Best regards,

        Frank

	Frank E. Taylor

        CERN                                      MIT 
        ATLAS Collaboration                       Bldg. 26 - Rm 569
        188-3-015                                 77 Mass. Ave.
        Route de Meyrin 385, CH-1211 Geneva 23    Cambridge, MA 02139
        Switzerland                               USA
        Office: +41-22-767-6373                   Office: 617-253-7249
        FAX: +41-22-767-8350                      FAX: 617-258-6923

        CELL:  857-891-8579 (USA & Europe) CERN CELL +41 76 487 3563
        email: [log in to unmask]
        web:   http://www2.lns.mit.edu/~fet/atlas_mit.html

On Tue, 23 Jun 2009, Ray F. Cowan wrote:

> Hi Everyone,
> 
> This week we meet at **2 PM Eastern**, Thursday, June 25, for our weekly LQS 
> meeting.  Dial-in is 510-665-5437, passcode 7336.  The time change is for
> this week only to accomodate Peter's monthly Energy task force meeting.
> 
> We'll take round-table reports first.  Peter suggested this dark matter 
> paper for our discussion this week: http://arXiv.org/pdf/0803.4196
> 
> "The WIMPless Miracle: Dark Matter Particles without Weak-scale Masses 
> or Weak Interactions"
> 
> The meeting agenda and the paper can be found at
> http://dmtpc.mit.edu/MaKaC/conferenceDisplay.py?confId=178
> 
> Hope you can join in.
> 
> Thanks much,
> --Ray
> 
> 


Top of Message | Previous Page | Permalink

Advanced Options


Options

Log In

Log In

Get Password

Get Password


Search Archives

Search Archives


Subscribe or Unsubscribe

Subscribe or Unsubscribe


Archives

October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
December 2012
November 2012
October 2012
September 2012
August 2012
July 2012
June 2012
May 2012
April 2012
March 2012
February 2012
January 2012
December 2011
November 2011
October 2011
September 2011
August 2011
July 2011
June 2011
May 2011
April 2011
March 2011
February 2011
January 2011
December 2010
November 2010
October 2010
September 2010
August 2010
July 2010
June 2010
May 2010
April 2010
March 2010
February 2010
January 2010
December 2009
November 2009
October 2009
September 2009
August 2009
July 2009
June 2009
May 2009
April 2009
March 2009
February 2009
January 2009
December 2008
November 2008
October 2008
September 2008
August 2008
July 2008
June 2008
May 2008
April 2008
March 2008
February 2008
January 2008

ATOM RSS1 RSS2



LISTSERV.SLAC.STANFORD.EDU

Secured by F-Secure Anti-Virus CataList Email List Search Powered by the LISTSERV Email List Manager

Privacy Notice, Security Notice and Terms of Use