Author: [log in to unmask]
Date: Thu Feb 5 16:48:18 2015
New Revision: 3502
Log:
First check-in of an sidloi3 variant with the RPC DHCal replaced by scintillators with 1x1 cm2 tilesize
Added:
projects/lcsim/trunk/detector-data/detectors/sidloi3_scint1x1/
########################################################################
Use REPLY-ALL to reply to list
To unsubscribe from the LCDET-SVN list, click the following link:
https://listserv.slac.stanford.edu/cgi-bin/wa?SUBED1=LCDET-SVN&A=1
|