There is one this afternoon at which I'll present our case for farm
cycles. Aside from BABAR, I guess we scrabble with the ESA and KLUE
(BNL) folks for the AIX dregs.
I'm attaching the one slide I will bring. Basically I'm saying we'll
start any time now and run until mid-April, having decided in early Feb
on what we need to continue producing. And assuming we can saturate
whatever they give us in that time.
Comments?
Richard
--
Richard Dubois
SLD, Stanford Linear Accelerator Center
[log in to unmask]
http://www.slac.stanford.edu/~richard/
650-926-3824
650-926-2923 (FAX)
|