Dear Colleagues, In July of this year the Department of Energy conducted an assessment of the Run II luminosity plan at the Fermilab Tevatron. The full report is now available online at: http://doe-hep.hep.net/RunII_Luminosity_Review_Report.pdf Appendix D contains the following table: Integrated Luminosity ( fb^(-1) ) Design Projection Base Projection per year Accumulated per year Accumulated FY03 0.22 0.30 0.20 0.28 FY04 0.38 0.68 0.31 0.59 FY05 0.67 1.36 0.39 0.98 FY06 0.89 2.24 0.50 1.48 FY07 1.53 3.78 0.63 2.11 FY08 2.37 6.15 1.14 3.25 FY09 2.42 8.57 1.16 4.41 Norman Graf