 In July of this year the Department of Energy conducted 
an assessment of the Run II luminosity plan at the
Fermilab Tevatron. The full report is now available
online at:
http://doe-hep.hep.net/RunII_Luminosity_Review_Report.pdf

Appendix D contains the following table:

         Integrated Luminosity ( fb^(-1) )

             Design Projection        Base Projection
         per year    Accumulated  per year  Accumulated
FY03      0.22           0.30       0.20       0.28
FY04      0.38           0.68       0.31       0.59
FY05      0.67           1.36       0.39       0.98
FY06      0.89           2.24       0.50       1.48
FY07      1.53           3.78       0.63       2.11
FY08      2.37           6.15       1.14       3.25
FY09      2.42           8.57       1.16       4.41