Print

Print


This is not known at the moment and I am not sure if we can do this. We 
are extenting the first mx bin to the cut value. I am not sure if there 
is still enough information for the fit, but Urs et al have done the 
same, haven't they?

Cheers,

	Wolfgang

[log in to unmask] wrote:
> How big is the error you get on the "total" rate, i.e. up to 2.5 GeV or
> so?  I have to admit that I'm a real fan of pursuing both the "theory
> intensive" and "OPE-only" approaches.
> 
> Bob
> 
> On Thu, 27 Jul 2006, Heiko Lacker wrote:
> 
>> Hi,
>>
>> there is one point to consider though: it is well possible that the
>> theoretical error will go down in the future such that the total
>> error would be smaller at e.g. 1.625. Therefore this conclusion is
>> a moving target.
>>
>> Cheers,
>> Heiko
>>
>>
>> On Thu, 27 Jul 2006, Wolfgang Menges wrote:
>>
>>> Hi Bob,
>>>
>>> 	we discussed this issue a bit after the AWG reading. We want to quote
>>> only the number for one Mx cut, which will be 1.55 GeV. We calculated
>>> all systematics for two other cuts, 1.625 and 1.7. The result at 1.55 is
>>> the best in total error. The numbers are in the appendix of our support BAD.
>>>
>>> Cheers,
>>>
>>> 	Wolfgang
>>>
>>> [log in to unmask] wrote:
>>>> One question that doesn't appear in the outline: for which cuts on Mx will
>>>> we show results?  In particular, how high in Mx do you plan to go?  Urs,
>>>> Rolf and Ed went to 2.5 GeV using Run 1-2 only; will you go this high?  If
>>>> not, why not?  Sorry if this question already has an obvious answer; I
>>>> hvaen't been following this closely.
>>>>
>>>> Bob
>>>>
>>>> On Wed, 26 Jul 2006, Jochen Dingfelder wrote:
>>>>
>>>>> Hi Heiko et al.:
>>>>>
>>>>> Thanks for informing us about your target time schedule.
>>>>> The PAC/DPAC were hoping to send your analysis to DPF,
>>>>> i.e. the analysis would have to go to RC by mid-September.
>>>>> Looking at your schedule this seems unlikely, right?
>>>>> Could you please confirm? We will then let the PAC know.
>>>>>
>>>>> Thanks,
>>>>> Jochen
>>>>>
>>>>>> here is our publication time schedule:
>>>>>>
>>>>>> End of July:  Documentation of new strategy of mES fit into BAD
>>>>>>               (Antonio & Concezio)
>>>>>>               Also D** issue?
>>>>>> August:       Parallel work:
>>>>>>               * Working on backup solution (Wolfgang)
>>>>>>                 --> higher purity cut: Old model
>>>>>>               * New strategy with higher purity cut (Chukwudi)
>>>>>> CM (Sept.):   Presentation of mES fit strategy
>>>>>>               Supporting document with fixed mES strategy --> AWG
>>>>>> End of Sep:   Analysis to RC (fit strategy approved?)
>>>>>> Beg. of Oct:  If yes: Evaluation of systematics
>>>>>> Mid of  Oct:  Paper draft to RC and then to CWR
>>>>>>
>>>>>> Our attempt to find a new well-controlled mES fit strategy
>>>>>> despite a lot of work has not converged to a stable version
>>>>>> yet. We suspect that we are suffering from the low purity.
>>>>>> As a consequence, we will try to understand if we can find
>>>>>> a stable solution with tighter cuts on purity. In parallel,
>>>>>> Wolfgang will look into the same direction but try to under-
>>>>>> stand if we could simply use in this case our old strategy
>>>>>> as a fall-back solution.
>>>>>>
>>>>>> A status report does not seem possbile before the September
>>>>>> CM due to the August holiday period.
>>>>>>
>>>>>> Cheers,
>>>>>> Heiko
>>>>>>
>>>>>>
>>>> \\\\\\\\\\\\\\\\\//////////////////\\\\\\\\\\\\\\\\\//////////////////
>>>> / Robert V. Kowalewski            \/  Dept. of Physics and Astronomy \
>>>> \ particle.phys.uvic.ca/~kowalews /\  University of Victoria         /
>>>> / Tel:   (250)721-7705            \/  P.O. Box 3055                  \
>>>> \ Email: [log in to unmask]         /\  Victoria, BC V8W 3P6           /
>>>> /////////////////\\\\\\\\\\\\\\\\\\/////////////////\\\\\\\\\\\\\\\\\\
>>>>
>>> --
>>> ------------------------------------------------------------------------
>>> Wolfgang Menges
>>> Queen Mary, University of London               SLAC, MS 35
>>> Mile End Road                                  2575 Sand Hill Road
>>> London, E1 4NS, UK                             Menlo Park, CA 94025, USA
>>> +44 20 7882 3753                               ++1 650 926 8503
>>>                                                 [log in to unmask]
>>> ------------------------------------------------------------------------
>>>
> 
> \\\\\\\\\\\\\\\\\//////////////////\\\\\\\\\\\\\\\\\//////////////////
> / Robert V. Kowalewski            \/  Dept. of Physics and Astronomy \
> \ particle.phys.uvic.ca/~kowalews /\  University of Victoria         /
> / Tel:   (250)721-7705            \/  P.O. Box 3055                  \
> \ Email: [log in to unmask]         /\  Victoria, BC V8W 3P6           /
> /////////////////\\\\\\\\\\\\\\\\\\/////////////////\\\\\\\\\\\\\\\\\\
> 

-- 
------------------------------------------------------------------------
Wolfgang Menges
Queen Mary, University of London               SLAC, MS 35
Mile End Road                                  2575 Sand Hill Road
London, E1 4NS, UK                             Menlo Park, CA 94025, USA
+44 20 7882 3753                               ++1 650 926 8503
                                                [log in to unmask]
------------------------------------------------------------------------