ATLAS SCCS Planning 23Aug2006
-----------------------------

  SCCS Conf Rm A, to call in +1 510 665 5437, press 1, 3935#

Present:

Agenda:

1. DQ2 Status/Web Proxy

2. Trigger Farm Status

3. ATLAS Oracle Server

4. Slots for ATLAS Production jobs and other batch related stuff

5. Validation of ATLAS jobs on RHEL

7. AOB

Action Items:
-------------

060816 Wei	Setup ATLAS/SLAC Webpage

060816 Charlie	Talk to SLUO about adding institutions.

060816 Neal	Setup atlas priority group for LSF

060816 Chuck	Check with Bob about web server approval need

060809 Stephen Ask what dq2user needs to do in MySQL
        060816 No good answer. Limited to dq2user from offsite can only
 	      SELECT from localreplicas. From onsite can do
 	      SELECT,UPDATE,DELETE and INSERT to either localreplicas
 	      or queued_transfers_SLAC. We'll see if that works or
 	      not. Without onsite privileges production stopped.

060412 Systems  Provide Oracle service for ATLAS Trigger testing (RT 46089)
        060419 No ticket yet, so nothing done.
        060426 Now have ticket 46089.
        060503 No news.
        060524 Steffen has provided configuration information. Now in Chuck's
 	      hands.
        060628 Randy will ask Chuck about status.
        060726 First on list for V240 but not sure when it will
               happen. Will put a T3a on it.
        060802 John checking for rack space.
        060809 Still needs allocated rack space.
        060816 Has rack and power, waiting for network.

060224 Richard	Discuss ATLAS trigger machines with others in SCCS
        060301 Only limited response from John W was resigned
 	      acceptance... need to work on an actual deployment plan as
 	      there are real issues to be solved.
        060308 John aware and in plans as much as anything is. New
 	      engineer will take over.
        060315 No update.
        060405 No update.
        060412 No update.
        060419 No update.
        060426 No update.
        060503 No update.
        060524 RT 45823. Engineer looking at power availability. On track for
 	      August.
        060628 Understand schedule, Randy will make sure John is aware.
        060726 Need to nail down when power will be available. Steffen
 	      things he can make it happen with existing equipment.
        060802 Looks like this will fit in SCCS. Can reuse rack,
               switches and fibres.
        060809 Everything looking good for this now.