ATLAS SCCS Planning 02Aug2006
-----------------------------

  SCCS Conf Rm A, to call in +1 510 665 5437, press 1, 3935#

Present: Chuck, Wei, Steffen, Shirley, Randy, Stephen, Booker

Agenda:

1. DQ2 Status/Web Proxy

    These was meeting Monday with the web team and security. No
    conclusion reached. Few things to do, allow access only from onsite
    to the web server, setup a new unix account to run everything
    under and send BobC some information on the developers. Hope to be
    able to close this issue in email. Also need to explore the
    security of the MySQL database.

    Stephen had sent the new account form to CHarlie to sign but forgot
    he was away. Chuck said he would deal with it so form been sent on
    to Chuck. WIll probably create a new primary group for ATLAS and
    this account will be the first "user".

2. Trigger Farm Status

    The farm has power to install it SCCS. We will reuse an existing
    racks in SCCS. Can also reuse switch parts and fibres from IR2. The
    fibres are at least 30 feet long as they go across racks in
    IR2. John is aware it will arrive sometime in September.

3. ATLAS Oracle Server

    Shirley talked to John this morning. Right afterwards he was going
    to talk to his team to see if they had found somewhere to rack it.

4. Slots for ATLAS Production jobs and other batch related stuff

    No changes since last week wrt to the failing jobs. It seems they
    are still sending jobs that try to access a database at CERN. The
    production folk know why they are failing (due to using an old
    release that doesn't know about the job transforms). Will determine
    what they are going to do about it.

    Charlie has asked for an LSF priority group to be created with Zach
    Marshall in it.

5. Tier2 Workshop @ Harvard 17-18 August

    There are five folk going (Chuck, Randy, Richard, Wei and BobC).

6. AOB

    Nothing else.

Action Items:
-------------

060802 Stephen	Email Su Dong about Tier2 Workshop

060802 Stephen	Find out about failing ATLAS jobs at SLAC

060726 Randy	Talk to Richard about DQ2 Workshop
        060802 Wei is well along on planning to going, but BNL has some
 	      trouble giving access. Normal process takes 90 days but
 	      hope to be able to do something faster by the 10th 
September.

060726 Charlie	Request ATLAS LSF priority group
        060802 Submitted, request is RT 50070.

060726 Stephen	Find out about maximum memory and local storage per job
        060802 No news yet.

060412 Systems  Provide Oracle service for ATLAS Trigger testing (RT 
46089)
        060419 No ticket yet, so nothing done.
        060426 Now have ticket 46089.
        060503 No news.
        060524 Steffen has provided configuration information. Now in 
Chuck's
 	      hands.
        060628 Randy will ask Chuck about status.
        060726 First on list for V240 but not sure when it will
               happen. Will put a T3a on it.
        060802 John checking for rack space.

060224 Chuck	Will check on web server request for DQ2 machine
        060301 Waiting for web server request information from Stephen.
        060308 Haven't checked yet; haven't received Stephen's request yet.
        060315 Still not sent Chuck information.
        060405 No update.
        060412 No update.
        060419 No update.
        060426 Resubmitted request as it was lost before.
        060503 Not heard anything for about two weeks.
        060524 Stephen need to update ticket, moving from yakut to DQ2 
machine.
        060628 Request updated now running on atl-dq2, waiting for scan.
        060726 Meeting on Monday about this.
        060802 Requesting new user to run services, blocked offsite web
 	      access, Need to explore MySQL security.

060224 Richard	Discuss ATLAS trigger machines with others in SCCS
        060301 Only limited response from John W was resigned
 	      acceptance... need to work on an actual deployment plan as
 	      there are real issues to be solved.
        060308 John aware and in plans as much as anything is. New
 	      engineer will take over.
        060315 No update.
        060405 No update.
        060412 No update.
        060419 No update.
        060426 No update.
        060503 No update.
        060524 RT 45823. Engineer looking at power availability. On track 
for
 	      August.
        060628 Understand schedule, Randy will make sure John is aware.
        060726 Need to nail down when power will be available. Steffen
 	      things he can make it happen with existing equipment.
        060802 Looks like this will fit in SCCS. Can reuse rack,
               switches and fibres.