[Happy New Year!] ATLAS SCCS Planning 3Jan2007 ---------------------------- 9am, SCCS Conf Rm A, to call in +1 510 665 5437, press 1, 3935# Present: Len, Bill, JohnB, Wei, Charlie, Stephen Agenda: 1. DQ2 Status/Web Proxy Running fine. Problems at Brookhaven. They cannot get the data out of Tier-2 sites fast enough so they are accumulating a lot of backup. Kaushik has to stop the production to allow it to catch up. Although the last couple of days look okay without stopping production. The bottleneck seems to be with FTS as BNL, don't seem to be an issue for SLAC. Seems to be related to empty files which are produced everywhere. There was a problem with a DBRelease file being transfered after a job started that needed it (there was an RT ticket opened against SLAC, RT#1383). This shouldn't have happened as the PANDA pilot does check this. This caused thirty jobs to fail. 2 Tier-2 Hardware Not sure where this is just now. Chuck isn't back till the end of next week. Last report was that the ATLAS purchase wasn't started yet as we need to make more power available which means making the Rackable purchase to do that. Need to make sure we don't sequentialise everything as lead times can be absorbed. 3. AOB Need to look at the DQ2 space to clean up "old junk". There are some duplicated files and only one is in the LRC. Need to define a policy on how to remove accounts from the GUMS server. Should be much simpler than regular accounts. Action Items: ------------- 061213 Booker Talk to AndyH (and others) about moving SRM interface forward 070103 Can plug in a gsiftp module for HPSS 6.2, DPM and dCache. Wei told AndyH but sure if it is useful. We are running HPSS 5.1 though. 061108 Richard Discuss with SLAC Security longterm approach to ATLAS VO 061115 No information. 061213 Nothing happened yet. 070103 No information.