Print

Print


ATLAS SCCS Planning 16May2007
-----------------------------

  9am, SCCS Conf Rm A, to call in +1 510 665 5437, press 1, 3935#

Present: Randy, Charlie, Wei, Chuck, JohnB, Richard, Booker, Andy

Agenda:

1. DQ2 Status/Web Proxy

    No issues this week, has been working quite well. There was a quite
    a good comment about our xrootd setup from Kaushik.

    For a user area to be controlled by DQ2 need to have a difference
    instance of DQ2 as the retention times are different. The other
    issue is that you need to put the user instance under the
    production instance file system wise.

2. Tier-2 Hardware

    Last status Storage is online and cooling racks are on schedule for
    CPUs. Last week an issue come up which has probably delayed the
    racks by a week. Somethings to do with the control software for
    them and also perhaps a water leak. The ATLAS machines are being
    unboxed. The rails are being installed in the racks.

    Will take John a week to get everything into the racks and all the
    connections. Then need a week to get the software installed and
    configured. Two weeks from when commissioning starts is
    optimistic. Would very like to have this stuff ready and producing
    output by 1st June, but might be tight. Shouldn't miss that by very
    much.

    Need to start thinking about next FY purchases. Do we have the
    infrastructure planned? There is a task force being constructed by
    the directorate (including David MacFarlane and folk from CEF among
    others and people from the user community). This group should
    collate the requirements for equipment from all areas. This is
    working urgently as at the beginning of the next FY we will have
    nothing new as have started doing nothing. Have observed you don't
    get any new cooling or power in less than six months but generally
    nearer two years. The Thumpers use about a quarter of the power per
    terabyte as the existing BaBar storage, so could spend money to
    liberate power. Some prioritisation has to take place as don't
    believe there is a way to provide everything needed as there are
    not enough dollars (to provide cooling and reduce power usage with
    replacing old equipment) or time (to do the engineering). Don't
    know if the next FY Tier-2 money has been timetabled yet. Expect it
    will be quad-core purchases in the next round. The ATLAS purchase
    for next year is in the planning (with a date that Richard can't
    remember right now). May need to discuss when it is needed if we
    should retire the ATLAS Trigger Cluster to provide more power.

3. xrootd/srm

    BNL is working on SRM, uses LBL version which is quite
    complicated. The FNAL SRM has been taken off the website. The only
    other one available is StoRM. The Italians are eager to do the
    integration. It is a question to get someone to manage it at
    INFN. Trying to encourage Fabrizio to do that but he is working on
    other things. The Italians recognise they will need this as they
    want to use it in their Tier-2s also. They have already integrated
    with with GTFS.

    Perhaps xrootd development world needs more structure to get people
    to work to timescales. We had that with BaBar and it worked well,
    but now there are many more clients spread much further.

    Need someone to come forward to lead this. Andy probably doesn't
    have the time.

    People are worried about not having a clear way of getting things
    done with xrootd. Would be happier when it is clear that the burden
    of support wouldn't get dumped on some other lab or
    experiment. Should we try to setup a collaboration for xrootd
    support? Should have another meeting to discuss this.

4. AFS Problems causing jobs to intermittently fail

    Nothing happened in last week.

5. AOB

    - Tier-2/3 Meeting in Indiana

    Travel budget is very tight so not sure if we can send Wei to
    it. There is a travel cap which hasn't changed every though we've
    joined ATLAS and need much more travel. Don't believe we can spend
    the Tier-2 money on travel, partly due to that. Sending one person
    to such a meeting does seems like the minimum we should do. If SLAC
    can't fund it we have a large amount of problems.

    - Tier-2 workshop

    Agreed to hold a workshop at SLAC. Need to figure out when a good
    time would be.

    - Americas Physics Workshop 20th-23rd August 2007

    First all-Americas workshop. May be a need for local accounts for
    attendees.


Action Items:
-------------

070516 Andy	Setup meeting about xrootd collaboration

070509 Stephen	Split up top-level AFS volume, requests to unix-admin
        070516 Not done yet.

070502 Stephen	Arrange meeting about ATLAS TAG data on PetaCache
        070509 Not done yet.
        070516 Not done yet. Did talk a little to David Quarrie.

070502 Wei	Check CA certificate update mechanism
        070509 Not done yet but believe VDT is the right way.
        070516 Need to talk to Booked and security team to verify.