ATLAS SCCS Planning 22Aug2007
-----------------------------

  9am, SCCS Conf Rm A, to call in +1 510 665 5437, press 1, 3935#

Present: Wei, Booker, JohnB, Randy, Stephen

Agenda:

1. DQ2 Status/Web Proxy

    Has been some problems with DQ2, not sure if it is at SLAC or
    not. There have been problems both at CERN and BNL. PANDA has
    registered to transfer many files from tape at BNL to SLAC so we
    are waiting for so long that FTS cuts off the transfer. This is
    either a tape problem or we need to change the software to wait
    longer. Michael Ernst is doing something else to bypass the DQ2
    system, he'd like SLAC to participate in this test. Not starting
    really from scratch, will still use the catalogue system. Will only
    use gsiftp not SRM. Worries about SRM being production quality.

    There wasn't any intervention on DQ2 till yesterday. Booker
    followed Wei's instructions for during the power outage and it
    seemed to work. Wei yesterday cleaned all the FTS pipe etc. Things
    looked better since.

    Would be interested to know which type of tape libraries and drives
    (and how many) are in use at BNL.

2. Tier-2 Hardware

    The only thing we can imagine ordering right now are Dell 1950s. As
    our code ran slightly better by clock than the AMD the ATLAS code
    is able to take advantage of the larger caches on Intel but not be
    too disadvantaged by the lower memory bandwidth.

    We have some Dell 1950s on order for BaBar to replace nomas and
    toris, there will be 120 to be installed in the water cooled
    racks. Not sure if there will be another order for BaBar by the end
    of the calender year. Thing there might be but not sure.

3. AOB

Action Items:
-------------

070905	Wei	Determine BNL contact for tape system information