ATLAS SCCS Planning 17Oct2007 ----------------------------- 9am, SCCS Conf Rm A, to call in +1 510 665 5437, press 1, 3935# Present: Wei, Stephen, Len, Charlie, Booker, JohnB, Chuck, Randy, Richard Agenda: 1. DQ2 Status/Web Proxy PANDA has been switch between DQ2 and PandaMover but things look okay at SLAC. There have been a lot of updates at BNL, the latest to DQ2 0.4.0 which seems to have make everything run well again. Need to work on getting a GSI authenticated PandaMover working. Were looking for a new machine but could perhaps use the existing machine as has was quite low CPU usage. In the future it is better to know the plans ahead of time to get security involved before software is deployed. Not sure there are existing communications channels that would allow this, may need to discuss with Michael or Torre. 2. Tier-2 Hardware Evaluating three candidates for BaBar, all Intel based. Will almost certainly want to get the same for ATLAS. For BaBar want to order mid-November and installed in December. To order together the money would need to arrive this week so unlikely. However, should be able to order more similar machines later. GLAST will probably be ordering on the same timescale as ATLAS so can put those together. GLAST want their machines by sometime mid-January, although their launch date has slipped a little. Almost certainly Intel quad core. AMD have had difficulties getting theirs out and it looks like GA would be first quarter of 08. Will be running RHEL4 on the new machines. 3. SSH w/ token passing With the switch v2 and Kerberos 5 you cannot pass CERN tokens to SLAC anymore. You could use things like getToken and setToken to pass it. You don't need to be root to use setToken, not sure about getToken. These are external commands (not standard AFS). Normal work method is to acquire tokens for SLAC and CERN on laptop then you can log on to both CERN and SLAC and use both cells. No one seems to be complaining though. Beyond the general issue CVS might be an issue. Booker/Wei will talk to DavidM to see if it all works okay. Will also try to think of other issues. Wonder if other labs also have an issue. Might be worth discussing at HEPiX. 4. Tier2/3 Workshop Wei forwarded an email about the agenda to everyone from MichaelE. RobG has setup a page at CERN with the agenda. The InfoMedia people have sent Wei a page for the meeting. It looks very nice and Wei has asked them to go ahead. There is an account to accept registration and payment. This needs to be added to the web page. They would also like to setup early registration before 14th November. Need to make sure there is enough time for folk to register. Wei will forward the URL of the InfoMedia page. 5. AOB - Network Tuning Single transfer can get 700-800Mbits/s in each directory. The transfer buffer was changed and a hardware function was turned on. There are statistics from BNL to various Tier-2 sites, you can see SLAC jump from 150Mb/s to 800Mb/s there. 600Mb/s works out at 5TB/day, we don't really have that much data to transfer. Right now there is a transfer test every two to three hours. Action Items: ------------- 071017 Wei Arrange meeting with DavidM. 071017 Stephen Think about other issues than might arrive w/out tokens