ATLAS SCCS Planning Oct 14, 2009 ---------------------------------------------------- 9am, SCCS Conf Rm A, to call in +1 510 665 5437, press 1, 3935# Present: Wei, Peter, Booker, Richard, Stefan Agenda: 1. Status of WT2 2009 hardware - With default allocation of 2/3 Storage and 1/3 CPU, the following have been purchased ($400k). DELL Poweredge R410, 2.8 GHz 8-core, 24G memory SUN X4540 Thor, 48 1-TB disks, 2.7GHz quad-core (10 units) - All CPUs and disk storage have been delivered to SLAC. Work is ongoing to install them; allocate rack space, power, cooling, etc. The plan is to have them ready for use before ATLAS data arrives, with a higher priority given to the storage. 2. Tier-2 Production and Operations - No issues with PANDA operations at SLAC. The problem with GRID certificates was traced to westgrid.ca. (triumf.ca is fine.). SRM service at LBNL and BNL folks are looking into the problem. - OSG upgrade completed; it requires lots of hands-on work by Booker and Wei once a year - New Frontier farm server has been installed. With 8GB memory and 3 Gb internal channel, it functions fine. More units can be added as needed. - User Analysis Test (UAT) is scheduled for Oct. 22-24. (It is now postponed to Oct. 28-30.) 3. Status of SLC5/RHEL5 for WT2 - Wei reported that 100 CPUs in WT2 farm have been migrated to REHL5-64, after validations by Booker and Wei. No issues with PANDA operations on these machines. Migration of the rest is to follow. 4. AOB