Print

Print


Everyone,

After Dieter asked me to give him the duration of one of today's runs I 
realized the way I was starting and stopping the EVR runs was 
inconsistent with the design of the software. Because of this, the run 
start, run stop and run time records were not being properly added to 
the data files.

Due to this I have updated the software to add an "Evr Running" 
selection to the run state control. To start a run you choose the state 
"Evr Running" and to stop a run you choose the state "Stopped". I have 
updated the confluence instructions to reflect this.

You still need to choose the proper EvrOpCode value to be either "10Hz" 
or "ESA_Beam" depending on the desired run mode.

-Ryan

-- 
Ryan Herbst
RED Electronics Department
SLAC National Accelerator Laboratory
2575 Sand Hill Road, M/S 96
Menlo Park, CA 94025
Office: 650-926-4911
Cell: 408-489-6582
Skype: ryanherbst

########################################################################
Use REPLY-ALL to reply to list

To unsubscribe from the KPIX-BEAMTEST-SOFTWARE list, click the following link:
https://listserv.slac.stanford.edu/cgi-bin/wa?SUBED1=KPIX-BEAMTEST-SOFTWARE&A=1