Everyone, After Dieter asked me to give him the duration of one of today's runs I realized the way I was starting and stopping the EVR runs was inconsistent with the design of the software. Because of this, the run start, run stop and run time records were not being properly added to the data files. Due to this I have updated the software to add an "Evr Running" selection to the run state control. To start a run you choose the state "Evr Running" and to stop a run you choose the state "Stopped". I have updated the confluence instructions to reflect this. You still need to choose the proper EvrOpCode value to be either "10Hz" or "ESA_Beam" depending on the desired run mode. -Ryan -- Ryan Herbst RED Electronics Department SLAC National Accelerator Laboratory 2575 Sand Hill Road, M/S 96 Menlo Park, CA 94025 Office: 650-926-4911 Cell: 408-489-6582 Skype: ryanherbst ######################################################################## Use REPLY-ALL to reply to list To unsubscribe from the KPIX-BEAMTEST-SOFTWARE list, click the following link: https://listserv.slac.stanford.edu/cgi-bin/wa?SUBED1=KPIX-BEAMTEST-SOFTWARE&A=1