Print

Print


Author: [log in to unmask]
Date: Mon Jan 11 19:20:53 2016
New Revision: 4112

Log:
fixing comment: it was incorrect regarding ecal y-position in lcdd, although it was correct for v4-4 compact.xml

Modified:
    java/trunk/detector-data/detectors/HPS-EngRun2015-Nominal-v4-4-fieldmap/HPS-EngRun2015-Nominal-v4-4-fieldmap.lcdd

Modified: java/trunk/detector-data/detectors/HPS-EngRun2015-Nominal-v4-4-fieldmap/HPS-EngRun2015-Nominal-v4-4-fieldmap.lcdd
 =============================================================================
--- java/trunk/detector-data/detectors/HPS-EngRun2015-Nominal-v4-4-fieldmap/HPS-EngRun2015-Nominal-v4-4-fieldmap.lcdd	(original)
+++ java/trunk/detector-data/detectors/HPS-EngRun2015-Nominal-v4-4-fieldmap/HPS-EngRun2015-Nominal-v4-4-fieldmap.lcdd	Mon Jan 11 19:20:53 2016
@@ -4,7 +4,7 @@
     <detector name="HPS-EngRun2015-Nominal-v4-4-fieldmap" />
     <generator name="GeomConverter" version="1.0" file="detectors/HPS-EngRun2015-Nominal-v4-4-fieldmap/compact.xml" checksum="546271450" />
     <author name="NONE" />
-    <comment>HPS detector for 2015 Engineering Run with tracker fully open this detector uses the corrected fieldmap scaled to -0.24T for 1.056 GeV running including SVT mechanical survey. The ECal top is shifted up 2.7 mm from nominal and the bottom is shifted down 0.9 mm from nominal. SVT alignment: 1) start from v3-2-fieldmap 2) beamspot BS_D: 3)BS_D-20k.gbl-5mradScatAngle-L01_L12_L23_L01_L12_L34_L45_L01_L12_tu</comment>
+    <comment>HPS detector for 2015 Engineering Run with tracker fully open this detector uses the corrected fieldmap scaled to -0.24T for 1.056 GeV running including SVT mechanical survey. The ECal top is shifted up 2.3 mm from nominal and the bottom is shifted down 2.4 mm from nominal, based only on tracking. SVT alignment: 1) start from v3-2-fieldmap 2) beamspot BS_D: 3)BS_D-20k.gbl-5mradScatAngle-L01_L12_L23_L01_L12_L34_L45_L01_L12_tu</comment>
   </header>
   <iddict>
     <idspec name="TrackerHitsFieldDef" length="46">