Print

Print


If running readout/recon MC using a 1.5mm detector geometry, does the run number cause the database to overwrite the SVT positions, or are the positions from the lcdd/compact always used?

Does "-DdisableAlignmentConstants" or some other flag prevent this?


Also, there is currently only a 1_5mm-v3-4-fieldmap detector available for 2015 (not v4-4-fieldmap). Would it be difficult to update the 1.5 and 2mm geometries to otherwise match the current Nominal ones (v4-4-fieldmap) with the ECal shift? Does it only involve switching the B-field in "HPS-PhysicsRun2016-1_5mm-v4-4" to the fieldmap used for 1.056 GeV, or are there other differences?


Bradley

########################################################################
Use REPLY-ALL to reply to list

To unsubscribe from the HPS-SOFTWARE list, click the following link:
https://listserv.slac.stanford.edu/cgi-bin/wa?SUBED1=HPS-SOFTWARE&A=1