After many weeks of work to finalize a safe electrical work plan, the SLAC O&M group has prioritized the repair which requires shut down the EV chargers this morning (Fri 10/6)

ALL B053 chargers will be initially powered go down.

Thereafter Charger 2 (both Ports) may be able to be powered up while both Charger 1 and Charger 2 (both charging Ports) remain inoperative during the repair which is likely to be all day.

Staff should plan to use the B041 or B950 PowerFlex brand chargers today as they remain operative (with noted units that are intermittent for future repair).


Rohendra Atapattu
Sustainability & Energy Program Manager
SLAC National Accelerator Laboratory
(808)769 1570


From: [log in to unmask] <[log in to unmask]> On Behalf Of Atapattu, Rohendra
Sent: Monday, July 17, 2023 2:03 PM
To: [log in to unmask]
Subject: Sign up for SLACK channel #ev_cars for most current updates

Just a general announcement that we are using the APP SLACK to notify SLAC EV users instead of the this email listserv.
Please sign in to SLACK app under the site SLAC
#ev_cars is the SLACK channel

Here is an image just FYI
[cid:[log in to unmask]]
Rohendra Atapattu
Sustainability & Energy Program Manager
SLAC National Accelerator Laboratory


________________________________

Use REPLY-ALL to reply to list

To unsubscribe from the EV_CHARGING list, click the following link:
https://listserv.slac.stanford.edu/cgi-bin/wa?SUBED1=EV_CHARGING&A=1

########################################################################
Use REPLY-ALL to reply to list

To unsubscribe from the EV_CHARGING list, click the following link:
https://listserv.slac.stanford.edu/cgi-bin/wa?SUBED1=EV_CHARGING&A=1