ATLAS SCCS Planning 30Aug2006
-----------------------------
SCCS Conf Rm A, to call in +1 510 665 5437, press 1, 3935#
Present:
Agenda:
1. DQ2 Status/Web Proxy
2. ATLAS Oracle Server
3. Slots for ATLAS Production jobs and other batch related stuff
4. Validation of ATLAS jobs on RHEL
5. Further report on Boston meeting
6. AOB
Action Items:
-------------
060823 Stephen Find out what current validation processes exist
060823 Wei Talk to Neal about raising the osgq limit
060816 Wei Setup ATLAS/SLAC Web page
060823 Wei circulated a not try to bring back comments for next
week.
060816 Charlie Talk to SLUO about adding institutions.
060816 Neal Setup atlas priority group for LSF
060823 Not done yet.
060816 Chuck Check with Bob about web server approval need
060823 To be done.
060809 Stephen Ask what dq2user needs to do in MySQL
060816 No good answer. Limited to dq2user from offsite can only
SELECT from localreplicas. From onsite can do
SELECT,UPDATE,DELETE and INSERT to either localreplicas
or queued_transfers_SLAC. We'll see if that works or
not. Without onsite privileges production stopped.
060823 Sounds like things are working again, but no concrete info.
060412 Systems Provide Oracle service for ATLAS Trigger testing (RT 46089)
060419 No ticket yet, so nothing done.
060426 Now have ticket 46089.
060503 No news.
060524 Steffen has provided configuration information. Now in Chuck's
hands.
060628 Randy will ask Chuck about status.
060726 First on list for V240 but not sure when it will
happen. Will put a T3a on it.
060802 John checking for rack space.
060809 Still needs allocated rack space.
060816 Has rack and power, waiting for network.
060823 Waiting for switch,
|