ATLAS SCCS Planning 25Oct2006
-----------------------------
9am, SCCS Conf Rm A, to call in +1 510 665 5437, press 1, 3935#
Present: JohnB, Steffen, Booker, Randy, Wei, Charlie
Agenda:
1. DQ2 Status/Web Proxy
- Maintenance
Wei has taken over running the service. He will start it running
under the production account. Also need to make sure Wei's DN is
registered for ATLAS. Will copy the old installation and run as
himself first. Then do reinstall with a new version.
dq2_get would not work with the web server being blocked from
offsite. Do need to pursue web server approval.
2. DDM Operations Manpower Request
This does not include the backend file storage. Only about the
transfering and DQ2. Probably a small fraction of Wei. Should check
if Len or Booker are interested in doing anything in the area.
3. Grid Account Precreation
Security requirement is that there is a one-to-one mapping between
Grid DNs to unix accounts. Can't just take all entries from the VO
incase it has some problems. Need to understand if we can trust the
VO. Many other places map all grid accounts to a single unix
account. We probably want to be able to trust the VO and have all
US ATLAS group members of the ATLAS VO have access. Need to talk to
Richard about this.
4. AOB
- TDAQ Test Farm
Installed and powered on second floor. Once machine did not survice
transport. Done from 50 to 49 machines. Only have switch for 47 so
this is okay. Thanks to everyone!
On their own VPN. Steffen will manage them. Only issue for SCCS
will be if power reset is needed.
- Request from ATLAS Production
Can we increase our 10 slots to move? Have 4500 jobs in executtion
just now, mostly BaBar. THere are 10000 waiting to run. Will
attempt to increase the number to see if it helps.
- Data Transfer
The DDM challenge is going rather well except for the Great Lake
Tier2. Have successfully transfered from CERN to BNL and from BNL
to Tier2s. Will today transfer back from Tier2s to BNL. After that
will do some function test.
Action Items:
-------------
061025 Stephen Talk with Ricahrd about trusting the ATLAS VO
061025 Wei Respond to manpower request
061025 Stephen Check web server approval status
061018 Wei Test gridftp with xrootd federation
061025 Probably not very soon, but should be on the agenda.
061004 Randy Find out about xrootd for ATLAS plans
061018 no news
061025 No information yet. Andy probably knows something.
061004 Richard Announce election of Chair/Chair-Elect of WT2 AB.
061004 Done
061004 Randy Project number of nodes for purchase for both 1GB/core
and 2GB/core
061018 no news
061025 Should get it this week.
060927 Stephen Write web page with description of SLAC batch system
061004 Copied BaBar page and started editing, hopefully in
better shape next week;
http://www.slac.stanford.edu/~gowdy/batchDesc.html
061018 no news
061025 Done. Some improvement is possible.
060816 Chuck Check with Bob about web server approval need
060823 To be done.
060830 To be done.
060906 Gary believes that it wouldn't need approval but should
check with Bob.
060913 Still need to talk to Bob.
060920 No news.
060927 Nothing yet.
061004 Not done yet.
061018 Torre Wenaus commented that if our web server is blocked,
dq2_get from outside will not work. Other things should be
OK.
|