ATLAS SCCS Planning Oct 14, 2009
----------------------------------------------------
9am, SCCS Conf Rm A, to call in +1 510 665 5437, press 1, 3935#
Present: Wei, Peter, Booker, Richard, Stefan
Agenda:
1. Status of WT2 2009 hardware
- With default allocation of 2/3 Storage and 1/3 CPU,
the following have been purchased ($400k).
DELL Poweredge R410, 2.8 GHz 8-core, 24G memory
SUN X4540 Thor, 48 1-TB disks, 2.7GHz quad-core (10 units)
- All CPUs and disk storage have been delivered to SLAC.
Work is ongoing to install them; allocate rack space, power,
cooling, etc. The plan is to have them ready for use before
ATLAS data arrives, with a higher priority given to the storage.
2. Tier-2 Production and Operations
- No issues with PANDA operations at SLAC.
The problem with GRID certificates was traced to westgrid.ca.
(triumf.ca is fine.). SRM service at LBNL and BNL folks are
looking into the problem.
- OSG upgrade completed; it requires lots of hands-on work
by Booker and Wei once a year
- New Frontier farm server has been installed. With 8GB memory
and 3 Gb internal channel, it functions fine. More units can be
added as needed.
- User Analysis Test (UAT) is scheduled for Oct. 22-24.
(It is now postponed to Oct. 28-30.)
3. Status of SLC5/RHEL5 for WT2
- Wei reported that 100 CPUs in WT2 farm have been migrated
to REHL5-64, after validations by Booker and Wei. No issues
with PANDA operations on these machines.
Migration of the rest is to follow.
4. AOB
|